DUBAI WATER CANAL - PHASE 3
DUBAI WATER CANAL - PHASE 3

2016 - Dubai, U.A.E.

Project located on the Sh. Zaid Road Dubai, with an investment of 1.77 billion AED, it includes drilling the water canal, constructing sides of the canal, three footbridges which will link the two backs of the canal, in addition to the construction of four marine transit stations to boost the role of marine transport.
Owner Gov. Dubai - Rta
Consultant Parson and Halcrow
Main Contractor Besix Llc
Qty 128 bored piles
Size ø 1000 and 1500 mm
Request information
Al Quoz Industrial Area First, P.O.Box 3905 - Dubai – U.A.E.
Related Services
Related Technologies