SECANT PILE RETAINING WALLS
SECANT PILE RETAINING WALLS

Secant Pile Retaining Walls

The method consists of drilling and concreting a series of primary or un-reinforced piles and secondary or reinforced piles at centre to centre, usually equal to twice the nominal pile diameter less a distance which varies from 100 to 150 mm. Secant piles are intended for both, as temporary retaining or permanent load bearing structures for deep excavation, and can also be used as cut-off wall.

Secant piles are designed and constructed by Swissboring to meet the most stringent specifications and requirement of any project.

Request information
Al Quoz Industrial Area First, P.O.Box 3905 - Dubai – U.A.E.
Related Services
Related Projects